A cost estimate table in SAP is a structured data object (a transparent table) that stores the results of product cost estimates (CK11N) — typically the material cost, cost components, and costing date. You enter a material, plant, and costing variant, and SAP calculates the estimated production or procurement cost; the table then holds that result for reporting, simulation, and price updates.
Formula
Cost per unit = (Material cost × (1 + Overhead% / 100)) / Quantity. Total cost = Material cost × (1 + Overhead% / 100). Variables: Material cost (p) in dollars, Quantity (qty) in units, Overhead% (ovh) as a percentage (e.g., 15 means 15%). This is a simplified version of what SAP does internally—SAP’s cost estimate table stores the sum of cost components (material, labor, overhead, etc.) rather than a single formula.
Worked Example
Using the defaults: Material cost = $1,000, Quantity = 1, Overhead = 15%.
- Total cost = 1000 × (1 + 15/100) = 1000 × 1.15 = $1,150.
- Cost per unit = 1150 / 1 = $1,150.
The calculator shows total cost $1,150 and cost per unit $1,150, matching the formula.
Assumptions
- The calculator assumes a single flat overhead percentage; real SAP cost estimates use multiple overhead rates per cost center.
- It ignores labor, machine hours, subcontracting, and material overhead—those are separate cost components in SAP.
- It assumes the material cost is already the total direct cost before overhead.
- It does not include currency conversion, price differences, or activity price revaluation.
What Is a Cost Estimate Table in SAP?
In SAP (both ECC and S/4HANA), a cost estimate table is a database table that stores the output of a product cost estimate. The most common table is CKIS (Cost Items for Cost Estimate) and CKHS (Cost Estimate Header). CKIS stores the individual cost components (e.g., material, labor, overhead) per item, while CKHS stores the header data like costing date, costing variant, and total cost. These tables are used by reports like CK13N (display cost estimate) and by the costing run (CK40N) to mass-update prices.
How SAP Creates and Stores Cost Estimates
When you run transaction CK11N (Create Cost Estimate), SAP performs these steps:
- It reads the BOM (Bill of Materials) and routing to determine materials and operations.
- It prices each component using the costing variant’s valuation strategy (e.g., standard price, moving average).
- It applies overhead rates, activity prices, and any other cost elements.
- It writes the result to CKHS (header) and CKIS (items).
The costing variant (e.g., PPC1 for standard cost) controls which prices and overheads are used. The costing date determines which price is used for materials.
How to Read and Use the Cost Estimate Table
To see the data in the table, use transaction SE16 or SE16N (table display) and enter the table name (e.g., CKIS). You can filter by material, plant, costing date, and costing variant. The key fields include:
- MATNR (material number)
- WERKS (plant)
- KALNR (cost estimate number)
- KSTAR (cost element)
- KSTEU (cost component)
- KSTAT (cost amount)
For reporting, you can use transaction CK13N to view a formatted cost estimate, or use SAP’s standard reports like S_P99_41000011 (Material Cost Estimate Report). The table is also used to update the material master’s standard price (transaction CK24) after a costing run.
Common Problems and Misconceptions
One common mistake is confusing the cost estimate table with the material master price fields. The table stores the estimate, but the material master stores the current price. Another issue is that cost estimates are time-dependent—they have a valid-from date, so you must check the costing date to get the right version. Also, many users think CKIS contains the total cost per material, but it actually contains line items per cost component; you need to sum them. Finally, in S/4HANA, the tables have changed (e.g., CKIS is replaced by ACDOCA for actuals, but cost estimates still use CKIS/CKHS).
How to Choose the Right Costing Variant
The costing variant determines the valuation basis. Common variants:
- PPC1: Standard cost estimate for production (uses standard prices).
- PPP1: Current cost estimate (uses current prices).
- PPC2: Cost estimate for sales order costing.
For a standard cost rollout, use PPC1. For simulation, you can copy a variant and change parameters. The variant controls whether to include overhead, which activity types, and the valuation strategy.
Frequently Asked Questions
What is the main table for cost estimates in SAP? The main tables are CKHS (header) and CKIS (items). CKHS stores the total cost and date, CKIS stores the individual cost components.
How do I see a cost estimate in SAP? Use transaction CK13N to display a cost estimate by entering the material, plant, and costing variant. You can also use SE16N on CKIS/CKHS.
Can I change a cost estimate table directly? No, you should not directly edit the table. Use transaction CK11N to create or change a cost estimate, then CK24 to update the price.
What is the difference between CKIS and CKHS? CKHS is the header with one row per cost estimate (material, plant, variant, total cost). CKIS is the item table with multiple rows per estimate—one per cost component.
Why does my cost estimate show zero cost? This usually happens because the costing variant has no price for a component, or the BOM/routing is missing. Check the costing log (transaction CK11N with log) to see errors.
Is the cost estimate table the same as the material ledger? No, the material ledger (ML) tracks actual costs and price differences; the cost estimate table is for planned costs. They are linked but serve different purposes.
Remember, this calculator provides a simple estimate of cost per unit; the actual SAP cost estimate table contains far more detail and is governed by your system configuration.
Related
Formula used
in p | Material cost (total) | $ | 1000 | 0 | 100000000 in qty | Quantity (units) | - | 1 | 0.000001 | 1000000 in ovh | Overhead % | % | 15 | 0 | 100 out unit | Cost per unit | $ | p * (1 + ovh / 100) / qty | 2 out total | Total cost incl. overhead | $ | p * (1 + ovh / 100) | 2
Each line is one input (in, sel, list) or one result (out: label, unit, formula, decimals). How the calculators work
Method: the standard loan formula for this calculation, fixed rate and monthly compounding unless stated, rounded as each result states. Not financial advice; no lender, rate or product is recommended. See formulas and assumptions, the disclaimer or report an error.
More in this section
- Debt-to-Income Ratio for Home Buying35.0 %
- Debt-to-Income Ratio for Rental Property
- Debt to Income Ratio Calculator & Formula30.0 %
- Debt to Income Ratio Excel Spreadsheet Guide30.00 %
- Debt to Income Ratio: Equation & Calculator
- Debt to Income Ratio Equation in Excel30.0 %